Major rail disruptions around and in Berlin until early 2026

Sunday, 28 Sep, 2025 0

Travelers across Germany’s rail network are bracing for months of delays and detours as Deutsche Bahn begins an ambitious construction project on one of its busiest north–south corridors. Starting October 1, 2025, no trains will operate between Berlin-Südkreuz and Bitterfeld until December 13 while working teams carry out a sweeping modernization of the line.

Longer Journeys and Lost Connections

The shutdown hits some of Germany’s most popular long-distance routes. High-speed ICE trains linking Berlin and Munich will be rerouted. It will translate into an additional 45 to 60 minutes to travel times between Berlin and Leipzig or Halle (Saale).

Direct connections between Frankfurt and Berlin via Erfurt are suspended entirely, though ICE service on the Frankfurt–Berlin route via Kassel remains intact. South of the capital, Lutherstadt Wittenberg will likewise lose all long-distance stops until mid-December.

Passengers accustomed to boarding at Berlin’s Südkreuz station will also feel the pinch: no long-distance trains will stop there during the work. Instead, some services will be rerouted to another connecting station, Berlin Ostkreuz. The move that will disrupt the city’s S-Bahn commuter rail on the central Stadtbahn corridor.

Regional travelers face extra hurdles

The construction affects more than cross-country travelers. In Brandenburg and Saxony-Anhalt, numerous regional lines will operate shortened routes, take lengthy detours, or be replaced entirely by buses. The disruption deepens on October 24, when Deutsche Bahn plans to extend the closure to include the section between Südkreuz and Berlin Central station (Hauptbahnhof). That second phase will impact additional regional services, although the Berlin S-Bahn is expected to maintain normal operations.

Massive Track and Signal Upgrades

The scale of the project underscores why Deutsche Bahn calls the shutdown essential. Crews will replace nearly 100 kilometers of track, refurbish another 38 kilometers, and install or overhaul a total of 92 rail switches. At Berlin Südkreuz, a key signal tower will be modernized. The work also ties into the long-planned Dresden rail link, slated to open in December, which promises faster trips from Berlin’s main station to the capital’s BER airport.

Deutsche Bahn says the comprehensive approach—grouping several major projects into one intensive closure—will pay off. Once the December timetable change takes effect, the Berlin–Bitterfeld corridor is expected to remain “construction-free” for at least three years, offering travelers a more reliable and faster connection along one of Germany’s most important rail arteries.

This major overhaul works come in parallel to another big modernization project : since August 1, 2025, the 278-kilometre line between Berlin and Hamburg is fully closed for major renovations. The closure will last through April 30, 2026. More than 180 km of track will be replaced, and over 200 switches will be renewed. Long-distance trains are being rerouted, adding on average 45 minutes to the journey.



Related News Stories:  Marseilles transportation links affected by fire     Luxembourg almost without rail services over the summer     Deutsche Bahn CEO ousted as rail delays spiral out of control in ...     Fire, rail cancellations cause Stansted Airport disruption     Flights resume at Marseille after wildfires forced airport closure     Flights cancelled amid national strike across Italy     Air Traffic controllers' strike planned in France on July 3 and 4, 2025     Destination Archives - Page 162 of 2474 - TravelMole     French ATC strike postponed     Air Canada upgrades compensation after strike    



 

profileimage

TravelMole Editorial Team



Most Read

Vegas’s Billion-Dollar Secrets – What They Don’t Want Tourists to Know

Visit Florida’s New CEO Bryan Griffin Shares His Vision for State Tourism with Graham

Chicago’s Tourism Renaissance: Graham Interviews Kristin Reynolds of Choose Chicago

Graham Talks with Cassandra McCauley of MMGY NextFactor About the Latest Industry Research

Destination International’s Andreas Weissenborn: Research, Advocacy, and Destination Impact

Graham and Don Welsh Discuss the Success of Destinations International’s Annual Conference

Graham and CEO Andre Kiwitz on Ventura Travel’s UK Move and Recruitment for the Role

Brett Laiken and Graham Discuss Florida’s Tourism Momentum and Global Appeal

Graham and Elliot Ferguson on Positioning DC as a Cultural and Inclusive Global Destination

Graham Talks to Fraser Last About His England-to-Ireland Trek for Mental Health Awareness

Kathy Nelson Tells Graham About the Honour of Hosting the World Cup and Kansas City’s Future

Graham McKenzie on Sir Richie Richardson’s Dual Passion for Golf and His Homeland, Antigua
TRAINING & COMPETITION
Skip to toolbar
Clearing CSS/JS assets' cache... Please wait until this notice disappears...
Updating... Please wait...